BIS 311 DeVry Week 1 Quiz

Downloading is very simple, you can download this Course here:

http://wiseamerican.us/product/bis-311-devry-week-1-quiz/

Or

Contact us at:

SUPPORT@WISEAMERICAN.US

BIS 311 DeVry Week 1 Quiz

BIS311

BIS 311 DeVry Week 1 Quiz

Question 1. 1. (TCO 1) A(n) _____ is a container that stores the projects and files for an entire application. (Points : 1)

  • window
  • solution
  • interface
  • package

Question 2. 2. (TCO 3) The programming process begins with a meeting between the programmer and the client. Which of the following activities is the last activity in the programming process? (Points : 1)

  • Build the user interface.
  • Code the application.
  • Test and debug.
  • Assemble the documentation.

Question 3. 3. (TCO 1) All the objects in an object-oriented program are created (instantiated) from a _____. (Points : 1)

  • project
  • form
  • class
  • property

Question 4. 4. (TCO 3) At design time, the programmer can change the form’s background color by changing the form’s _____ property. (Points : 1)

  • BackGround
  • Color
  • BackColor
  • ForeColor

Question 5. 5. (TCO 1) When you click the ellipsis (…) button in the Settings box of the Font property, _____. (Points : 1)

  • a list of font styles appears
  • a color palette appears
  • a dialog box opens
  • the attribute is removed

Question 6. 6. (TCO 3) The character used to create an access key by inserting it into a text property is _____. (Points : 1)

  • ~
  • ^
  • &
  • +

Question 7. 7. (TCO 1) The Toolbox window _____. (Points : 1)

  • displays the names of the projects and files included in a solution
  • displays data connections and servers
  • displays the tools you use when creating your application’s interface
  • displays the classes, methods, and properties included in a solution

Question 8. 8. (TCO 3) In Windows applications, pressing the _____ and Tab keys simultaneously moves the focus backwards. (Points : 1)

  • Shift
  • Ctrl
  • Alt
  • Ctrl + Shift

Question 9. 9. (TCO 1) A label’s _____ property determines the value that appears inside the label on a form. (Points : 1)

  • Caption
  • Name
  • Text
  • Values

Question 10. 10. (TCO 3) Short, English-like phrases that are written to represent the steps a program must take to solve a particular problem are called _____. (Points : 1)

  • flowcharts
  • pseudocode
  • object code
  • macro code

Question 11. 11. (TCO 1) The _____ function key will start a Visual Basic 2012 application in the IDE. (Points : 1)

  • F2
  • F3
  • F4
  • F5

Question 12. 12. (TCO 3) A(n) _____ is a predefined procedure that performs a specific task and then returns a value. (Points : 1)

  • algorithm
  • function
  • Sub procedure
  • class

Question 13. 13. (TCO 1) A(n) _____ is a predefined procedure that you can call (or invoke) when needed. (Points : 1)

  • method
  • object
  • class
  • event

Question 14. 14. (TCO 3) In the mathematical expression 4 * 3 + 15 / 3 – 6, which operation is performed last? (Points : 1)

  • +
  • *
  • /

Question 15. 15. (TCO 2) Software developers and programmers use _____ to develop the logic of a solution prior to coding the solution. (Points : 1)

  • flowcharts and pseudocode
  • algorithms
  • instructions
  • All of the above

Question 16. 16. (TCO 2) The third column in a TOE chart lists _____. (Points : 1)

  • objects to be used in an application’s tasks
  • tasks the application must perform
  • events that cause the application to perform tasks
  • errors that may occur when running the application

Question 17. 17. (TCO 3) A rectangle on a flowchart represents _____. (Points : 1)

  • an input or output operation
  • the beginning of the application
  • a processing step such as a calculation
  • the end of the application

Question 18. 18. TCO 2) In the V-Model of systems development, usability and acceptance testing verifies the correctness of _____. (Points : 1)

  • implementation
  • design
  • analysis
  • unit testing

Question 19. 19. (TCO 2) Correcting coding defects found in an application is called _____. (Points : 1)

  • deploying
  • documenting
  • debugging
  • designing

Question 20. 20. (TCO 3) The backslash () operator in Visual Basic performs _____. (Points : 1)

  • exponentiation
  • integer division
  • multiplication
  • negation