BSOP 206 DeVry Week 6 Quiz Latest

Downloading is very simple, you can download this Course here:

http://wiseamerican.us/product/bsop-206-devry-week-6-quiz-latest/

Or

Contact us at:

SUPPORT@WISEAMERICAN.US

BSOP 206 DeVry Week 6 Quiz Latest

BSOP206

BSOP 206 DeVry Week 6 Quiz Latest

  1. Question : (TCO 3)Which one of the following is a benefit of the implementation of JIT?
  • increased cost
  • overproduction
  • increased delays in production time
  • quality improvement

Question 2. Question : (TCO 3) In the just-in-time framework, waste is:

  • steps that add value.
  • necessary to the elimination of variability.
  • the natural by-product of a push system
  • anything that does not add value

Question 3. Question : (TCO 3) Which of the following is a goal of JIT partnerships?

  • reduce inventory and variability
  • increase variability
  • increase in-transit inventory
  • elimination of engineering changes

Question 4. Question : (TCO 3) Which of the following is not a benefit of small production lots?

  • work-in-process inventory is smaller
  • holding costs decrease
  • workstations can be placed closer together
  • manufacturing cycle time is longer

Question 5. Question : (TCO 3) Level schedules:

  • requires that schedules be met with variation
  • process many small batches rather than one large one
  • is known as “kidney bean” scheduling
  • all of the above are true regarding level scheduling

Question 6. Question : (TCO 12) The typical time horizon for aggregate planning is:

  • less than a month
  • up to three months
  • three to 18 months
  • over one year
  • over five years

Question 7. Question : (TCO 12) The planning tasks not associated with staffing, production, inventory, and sub-contracting levels typically fall under:

  • short-range plans
  • strategic planning
  • long-range plans
  • demand options none of the above

Question 8. Question : (TCO 12) Aggregate planning is prepared:

  • directly from the short-term scheduling
  • directly from the capacity plans
  • from work center loading up
  • from master schedules
  • from the dispatch plans

Question 9. Question : (TCO 12) Which of the following aggregate planning strategies is not a “capacity option”?

  • influencing demand by changing price
  • absorb change in demand during the planning period
  • modify the workforce to absorb fluctuations
  • changes due to varying size of the workforce
  • all of the above are capacity options

Question 10. Question : (TCO 12) Which of the following is the term used for medium range capacity planning with a time horizon of three to 18 months?

  • material requirements planning
  • short-range planning
  • strategic planning
  • aggregate planning

 

Question 1. Question : (TCO 3) Match the following terms with their correct definition. Comments:

Question 2. Question : (TCO 3) Define the linkage of continuous improvement and TPS.

Question 3. Question : (TCO 3) Identify three ways in which JIT contributes to a competitive advantage?

Question 4. Question : (TCO 3) What are three ways in which JIT and the Cost of Quality are related?

Question 5. Question : (TCO 12) What is level-scheduling and what does it do?

Question 6. Question : (TCO 12) What makes short-term scheduling of strategic importance?

Question 7. Question : (TCO 12) What is aggregate planning, and what is its key objective?