Question 1.1.(TCO 4) MRP is a process that would be most applicable in which situation?(Points : 5)
- Planning requirements for repair parts for production equipment in a manufacturing plant
- Planning requirements for safety stocks of finished goods in a distribution center
- Planning requirements for bicycle seats in a bicycle production plant
- A and C
- None of the above
Question 2.2.(TCO 4) The longest lead time path in the BOM is the(Points : 5)
- time bucket.
- planning horizon.
- time window.
- cumulative lead time.
Question 3.3.(TCO 4) A master production schedule shows the following information.
Using a lot-for-lot rule, what is the MPS quantity for Period 1?(Points : 5)
- 90
- 80
- 100
- 40
Question 4.4.(TCO 4) Which of the following is not included in the information about the inventory records file for an item?(Points : 5)
- Safety stock
- Preferred order quantity
- Net requirements
- Lead time
Question 5.5.(TCO 4) The following table shows capacity requirements data for making toys.
- A load profile would show(Points : 5)
- load above capacity in Periods 3 and 5.
- load below capacity in Periods 1 and 3.
- that load is never exactly equal to capacity in all periods.
- None of the above
Question 6.6.(TCO 4) The positioning and replenishment of finished goods inventories at the retail level can be determined using(Points : 5)
- MRP.
- CRP.
- DRP.
- RFID.