Question 1.1.(TCO 4) MRP is a process that would be most applicable in which situation?(Points : 5)

  • Planning requirements for repair parts for production equipment in a manufacturing plant
  • Planning requirements for safety stocks of finished goods in a distribution center
  • Planning requirements for bicycle seats in a bicycle production plant
  • A and C
  • None of the above

Question 2.2.(TCO 4) The longest lead time path in the BOM is the(Points : 5)

  • time bucket.
  • planning horizon.
  • time window.
  • cumulative lead time.

Question 3.3.(TCO 4) A master production schedule shows the following information.

Using a lot-for-lot rule, what is the MPS quantity for Period 1?(Points : 5)

  • 90
  • 80
  • 100
  • 40

Question 4.4.(TCO 4) Which of the following is not included in the information about the inventory records file for an item?(Points : 5)

  • Safety stock
  • Preferred order quantity
  • Net requirements
  • Lead time

Question 5.5.(TCO 4) The following table shows capacity requirements data for making toys.

  • A load profile would show(Points : 5)
  • load above capacity in Periods 3 and 5.
  • load below capacity in Periods 1 and 3.
  • that load is never exactly equal to capacity in all periods.
  • None of the above

Question 6.6.(TCO 4) The positioning and replenishment of finished goods inventories at the retail level can be determined using(Points : 5)

  • MRP.
  • CRP.
  • DRP.
  • RFID.